2014
Opet Daloyoba Project
Φ120/Φ150 Bored Pile (96 m / 642 m)
Employer : Hanyapı İnşaat Mimarlık Mühendislik Müşavirlik ve Taahhüt San. ve Tic. A.Ş.
2014
Bağfaş Gübre Fertilizer Project
Φ100 Bored Pile (250 m)
Employer : Burçelik Bursa Çelik Döküm Sanayi A.Ş.
2014
Selçuk Karabıyık Housing Project
Φ65 Bored Pile (1.500 m)
Employer : İrem İnşaat Sanayi Ticaret Ltd.Şti.
2014
Çekok Food Factory Project
Φ65 Bored Pile (3.000 m)
Employer : İrem İnşaat Sanayi Ticaret Ltd.Şti.
2014
Türkiye Finans Katılım Bank Center Construction Project – Ümraniye
Φ80 Bored Pile (1.200 m)
Employer : Derintaş İnşaat ve Ticaret Ltd.Şti..
2013
İskenderun Thermal Power Plant Project
Φ80/Φ100/Φ120 Bored Pile (300 m / 2.000 m / 300 m)
Employer : Kutay İnşaat Taahhüt Ticaret Ltd.Şti.
2012
Amasya Ring Road Şehzadeler Viaduct Project
Φ120 Bored Pile (690 m/757 m)
Employer : As İnşaat A.Ş.
2012
Istanbul Anatolia Metro Project Yenikapı Station Project
Φ100 Tangent / Intersecting Bored Pile(690 m/757 m)
Employer : Yüksel – Güriş A.O.
2012
İstanbul Ataşehir Sarphan Finanspark Project
Φ100 Sıralı Bored Pile (2.345 m)
Employer : CMC İnşaat A.Ş.
2011 – 2012
Istanbul Light Metro System Escape Shafts between Otogar-Kirazli
Φ80 Tangent Bored Pile(4.745 m)
Employer : Gülermak – Doğuş A.O.
2010
Emaar New İstanbul Development Project
Φ80 cm Bored Pile (625 m)
Employer : Makyol – Terra Zemin
2010
Kadıköy Kartal Metro Line Ünalan Station and Pedestrian Connection between Uzunçayır Metrobus Station and Akasya Acıbadem
Φ100 cm Bored Pile (4.800 m)
3/6 Prestressed Anchorage Work(4.750 m)
Φ80 cm Jetgrout Works (102.000 m)
Employer : SAF Gayrimenkul Geliştirme İnşaat ve Ticaret A.Ş.
2008-2009
Otogar Bağcılar Rail Public Transportation System Construction Electromechanical Construction Works, 2 Telli Güney Sanayi Metro Station Construction within the Scope of Vehicle Supply
Φ65 cm Bored Pile (12.000m)
3/6 Prestressed Anchorage Work (49.750 m)
Employer : Gülermak – Doğuş A.O.