OVERSEA PROJECTS

2013 – BIN LADIN GROUP
Waterproofing Works of Highway, Pedestrian Crossing Tunnels in Mecca – Haram Area / MAKKAH

2013 – BIN LADIN GROUP
Jamarat Phase 3 Shoaibain Link Project,
Highway Tunnel Lining Concrete, Steel Shoring and Steel Reinforcement Works / MAKKAH

2008 – BECHTEL – ENKA J.V.
Rreshen – Kalimash Highway Tunnel Excavation, Waterproofing, Concrete Works / ALBANIA

2006 – GAMA INDUSRTY ARABIA LTD.
Yamam 5 Project, Under Cement Silo C119 Section 1 Tunnel Construction Excavation and Supporting Works / RIYAD

2005 – MINISTRY OF WATER AND ELECTRICITY AFFAIRS, KINGDOM OF SAUDI ARABIA
Upstream and Downstream Cofferdams Drilling & Injection Works within the Scope of Al-Lith Dam Project / JEDDAH

2005 – MINISTRY OF WATER AND ELECTRICITY AFFAIRS, KINGDOM OF SAUDI ARABIA
Construction of Diversion Tunnel and Access Gallery within the Scope of Al-Lith Dam Project / JEDDAH

2005 – ALAWI TUNSI
Tunnel Waterproofing and Lining Works between Mina and Al-Muaysim within the scope of King Khalid Bridge Extension to Al-Muaysim Road Section 2 Project (Section II) / MAKKAH

2005 – YÜKSEL İNŞAAT SAUDIA CO. 
Murwani Dam Project, Diversion Tunnel Excavation and Tunnel Lining Concrete Works / CİDDE

2004 – ZAFER İNŞAAT A.Ş.
Apron and Waste Water Treatment Plant Earthworks / BALAD

2004 – ALAWI TUNSI
Tunnel Excavation and Fortification Works between Mina and Al-Muaysim within the scope of King Khalid Bridge Extension to Al-Muaysim Road Section 2 Project (Section I) / MAKKAH

2003 – ZAFER İNŞAAT A.Ş.
US Army Corps Tbilisi Helicopter Aircraft Parking Area Arrangement Work / TIFLIS