Artvin Dam and HEPP Construction / Artvin

Tunnel Excavation & Supporting / Concrete Lining / Waterproofing

Date: 2011-2013
Project: Artvin Dam and HEPP Project, T8 – T9 – T10 – T11 Relocation Motorway Tunnel Construction Artvin – Turkey
Description: Tunnel Excavation, Waterproof and Reinforced Concrete Lining Works
Tunnel Features: Area : 90 m2 Length : 3.996 m
Employer: AYSON Geoteknik ve İnşaat A.Ş.